您好,欢迎光临本网站![请登录][注册会员]  
文件名称: 施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue.pdf
  所属分类: 其它
  开发工具:
  文件大小: 2mb
  下载次数: 0
  上传时间: 2019-09-16
  提 供 者: weixin_********
 详细说明: 施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Cataloguepdf,施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue Components for changing direction 1、Edgewise elbow. One model for each size of casing for turning to left or right. 2、Flatwise tee Two models for each size of casing (one ascending, one descending) . 3、Edgewise tee For vertical branches on the main run. 二、Fixing devices 1、Universal brackets These brackets are used to fix the distribution run to the structure of the building, directly or via a threaded rod, a bracket, etc. There is one model for each size of casing which can be used for all mounting methods : ceiling mounted, suspended, wall mounted, etc. Suspension on chains or steel cables is not rec- ommended. It is advisable to leave a space of 3 m between each bracket. 2、Spring brackets These brackets are fixed on floor ground to sup- port distribution run in vertical application, used in rising building such as rising apartment, com- mercial skyscraper, etc. For all ratings from 100 to 800A, there’s only one model and must be used in couple. The spring brackets can absorb the vertical construction expansion and adjust the busbar situation, so as to distributing equally and averagely on all floors.
(系统自动生成,下载前可以参看下载内容)

下载文件列表

相关说明

  • 本站资源为会员上传分享交流与学习,如有侵犯您的权益,请联系我们删除.
  • 本站是交换下载平台,提供交流渠道,下载内容来自于网络,除下载问题外,其它问题请自行百度
  • 本站已设置防盗链,请勿用迅雷、QQ旋风等多线程下载软件下载资源,下载后用WinRAR最新版进行解压.
  • 如果您发现内容无法下载,请稍后再次尝试;或者到消费记录里找到下载记录反馈给我们.
  • 下载后发现下载的内容跟说明不相乎,请到消费记录里找到下载记录反馈给我们,经确认后退回积分.
  • 如下载前有疑问,可以通过点击"提供者"的名字,查看对方的联系方式,联系对方咨询.
 相关搜索:
 输入关键字,在本站1000多万海量源码库中尽情搜索: