文件名称:
FIDIC-MDB-2010-GCC-Construction (正版).pdf
开发工具:
文件大小: 446kb
下载次数: 0
上传时间: 2019-10-06
详细说明:fidic施工合同条件 2010多边银行协调版 红皮书4.3 Contractor's Representative
4.4 Subcontractors
4.5 Assignment of Benefit of Subcontract
4.6 Co-operation
4.7 Setting out
4.8 Safety Procedures
4.9 Quality Assurance
4.10 Site Data
4.11 Sufficiency of the Accepted Contract Amount
4.12 Unforeseeable Physical Conditions
4.13 Rights of Way and Facilities
4.14 Avoidance of interference
4.15 Access route
4.16 Transport of Goods
4.17 Contractor's equipment
4.18 Protection of the Environment
4.19 Electricity, Water and Gas
4.20 Employer's Equipmen
Free-Issue Materials
4.21 Progress Reports
4.22 Security of the site
4.23 Contractor's Operations on Site
4.24 Fossils
5 NOMINATED SUBCONTRACTORS
5.1 Definition of nominated subcontr
5.2 Objection to Nomination
5.3 Payments to nominated Subcontractors
5.4 Evidence of Payments
6 STAFF AND LABOUR
.。.,,,.,24
6. 1 Engagement of Statf and Labour
6.2 Rates of Wages and Conditions of Labour
6.3 Persons in the Service of Employer
6.4 Labour Laws
6.5 Working Hours
6.6 Facilities for statf and Labour
6. 7 Health and Safety
6.8 Contractor's Superintendence
6.9 Contractors Personnel
6. 10 Records of Contractor's Personnel and equipment
6. 11 Disorderly Conduct
6. 12 Foreign Personnel
6.13 Supply of Foodstuffs
6. 14 Supply of Water
6.15 Measures against Insect and Pest Nuisance
6. 16 Alcoholic Liquor or Drug
6.17 Arms and Ammunition
6.18 Festival and Religious Customs
ED Do619 Funeral Arrangements
6.20 Forced Labour
6
C
6.22/ Employment Records of Workers
28 Workers' Organisatio
O FIDIC 26.24 Non-Discrimination and Equal Opportunity
C FIDIC 2010. Conditions of Contract for Construction MDB Harmonised ed June 2010- General Conditions
For participating development bank financed contract use only. No reproduction of th s document is permitted
7 PLANT MATERIALS AND WORKMANSHIP
7.1 Manner of execution
7.2 Samples
7.3 Inspection
7.4 Testing
7.5 Rejection
7.6 Remedial Work
7.7 Ownership of Plant and materials
7.8 Royalties
8 COMMENCEMENT. DELAYS AND SUSPENSION
30
8. 1 Commencement of works
8. 2 T ime for Completion
8.3 Programme
8.4 Extension of Time for Completion
8.5 Delays Caused by Authorities
8.6 Rate of Progress
8.7 Delay Damages
8.8 Suspension of Work
8.9 Consequences of Suspension
8. 10 Payment for Plant and Materials in Event of Suspension
8. 11 Prolonged Suspension
8.12 Resumption of Work
9 TESTS ON COMPLETION
.34
9. 1 Contractors obligations
9.2 Delayed Tests
9.3 Retesting
9. 4 Failure to Pass Tests on Completion
10 EMPLOYERS TAKING OVER
,35
10.1 Taking Over of the Works and Sections
10.2 Taking Over of Parts of the Works
10.3 Interterence with Tests on Completion
10.4 Surfaces Requiring reinstatement
11 DEFECTS LIABILITY
,37
11.1 Completion of Outstanding Work and Ri
ving Detec
11.2 Cost of Remedying Defects
11.3 Extension of Defects Notification Period
11. 4 Failure to Remedy Defects
11.5 Removal of Defective Work
11.6 Further Test
11.7 Right of Access
11.8 Contractor to search
KTED D
ance Certificate
fo Unfulfilled Oblig
fi clearance of Sit
DIC 2
FIDIC 2010. Conditions of Contract for Construction mDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
12 MEASUREMENT AND EVALUATION
39
12.1 Works to be me
12.2 Method of measurement
12.3 Evaluation
12 Omissions
13 VARIATIONS AND ADJUSTMENTS
41
13. 1 Right to
13.2 Value Engineering
13.3 Variation Procedure
13. 4 Payment in Applicable Currencies
13.5 Provisional Su
3.6 Daywork
13.7 Adjustments for Changes in Legislation
13.8 Adjustments for Changes in Cost
4 CONTRACT PRICE AND PAYMENT.,.,,45
4.1 The contract price
14.2 Advance Payment
14.3 Application for Interim Payment Certificates
14.4 Schedule of Payments
14.5 Plant and materials intended for the works
4.6 Issue of Interim Payment Certificates
14.7 Payment
4.8 Delayed payment
14.9 Payment of Retention Mo
14.10 Statement at Completion
14.11 Application for Final Payment Certificate
14.12 Discharge
14.13 Issue of Final Payment Certiticate
1414 Cessation of Employer's Liability
4. 1 5 Currencies of Payment
15 TERMINATION BY EMPLOYER
53
15.1 Notice to Correct
15.2 Termination by Employer
15.3 Valuation at date of termination
15.4 Payment after Termination
15.5 Employer's Entitlement to Termination for Convenience
15.6 Corrupt or Fraudulent Practices
16 SUSPENSION AND TERMINATION BY CONTRACTOR
,,.,55
16.1 Contractor' s Entitle
Suspend Work
16.2 Termination by Contractor
16.3 Cessation of Work and removal of Contractor's equipment
ED D
ds. 4 Payment on terminatio
EFIDi1z RISK AND RESPONSIBILITY
57
11 Indemnities
DIC 2017.2 Contractor's Care of the Works
DIC 2010. Conditions of Contract for Construction MDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
17.3 Employer's Risks
17.4C
ices of Employer's Risks
17.5 Intellectual and Industrial Property Rigl
17.6 imitation of liabi
177∪ se of employers Ac
dation/Facilities
8 INSURANCE
60
18.1 General Requirements for Insurances
18.2 Insurance for Works and Contractor's Equipment
18.3 Insurance agai
iry to Persons and damage to Property
18.4 Ins
surance tor contractors personnel
19 FORCE MAJEURE,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,63
19. 1 Definition of Force Majeure
1 9.2 Notice of Force Majel
19.3 Duty to Minimise De
19.4 Consequences of Force Majeure
19.5 Force Majeure Aftecting Subcontractor
19.6 Optional Termination, Payment and Rel
19.7 Release from Performance
20 CLAIMS, DISPUTES AND ARBITRATION
65
20.1 Contractor's Claims
20.2 Appointment of the dispute bo
20.3 Failure to Agree on the Composition of the Dispute Board
20.4 Obtaining Dispute Board's Decision
20.5 Amicable Settlement
20.6 Arbitration
20.7 Failure to comply with Dispute Board's Decision
20.8 Expiry of Dispute Board's Appointment
APPENDⅨ: DISPUTE BOARD
,,,,,,:70
General Conditions of Dispute Board Agreement
Annex: Procedural Rules
INDEX OF SUB-CLAUSES
,77
DD
O FIDIC 2
DIC 2010. Conditions of Contract for Construction MDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
Definitions listed alphabetically
1.4.1 Accepted Contract Amount
1.1.4.7 Interim Payment Certiticate
1.1,2.11Bank
1.6.5 Laws
1.1.3.1 Base Date
1.1.1.3 Letter of Acceptance
1.1.1.9 Bill of Quantities
1.1.1, 4 Letter of tender
1.1.2. 12 Borrower
1.4.8 Local Currency
1.1.3.2 Commencement date
1.1.5.3 Materials
1.1.1.1 Contract
1.1.6. 10 Notice of Dissatisfaction
1.1.1.2 Contract Agreement
1.1.2.1 Party
1.1.1.10 Contract Data
1. 1.4.9 Payment Certificate
1.1.4.2 Contract Price
1.1. 3.8 Performance Certificate
1.1.2.3 Contractor
1.1.6.6 Performance security
1.6.1 Contractor's Documents
1.1.5.4 Permanent Works
1.1.5. 1 Contractor's Equipment
1.1. 5.5 Plant
1.1,2.7 Contractor's Personnel
1.1.4.10 Provisional surm
1.1.2.5 Contractor's Representative 1.1. 4.11 Retention Money
1.1.43Cost
1.1.1.7 Schedules
1.1.6.2 Country
1.1.1.9 Schedule, Payment Currencies
1.1.29DB
1.1.5.6 Section
1.139dav
1.1.6.7Ste
1.1.1.9 Daywork Schedule
1.1.1.5 Specification
1.1.3.7 Defects Notification period
1.1. 4.12 Statement
1.1.6 Drawings
1.1.2.8 Subcontractor
1.1.2.2 Employer
1.1.3.5 Taking-Over Certificate
1.1.6.3 Employer's Equipment
1.1.5.7 Temporary Works
1.1.2.6 Employer's Personnel
1.1.1.8 Tender
1.2.4En
1.3.6 Tests after Completion
1.1.2.10F|D|C
1.1.3.4 Tests on Completion
ED DoC 1. 4. 4 Final Payment Certiticate
1.1.3.3 Time for Completion
14.5 Final Statement
1.1.6.8 Unforeseeable
11.6.4 Force Maieure
1.1.6.9∨ aviatic
14.6
Foreign Currency
1.1.5.8 Works
DIC
IDIC 2010. Conditions of contract for Construction mDb harmonised ed June 2010- General Conditions
participating development bank financed contract use only. No reproduction of th s document is permitted
General Conditions
General Provisions
Definitions
In the Conditions of Contract("these Conditions"), which include Particular Conditions
Parts A and B, and these General Conditions, the following words and expressions
shall have the meanings stated. Words indicating persons or parties include
corporations and other legal entities, except where the context requires otherwise
1.1.1
The Contract
1.1.1.1Contract"means the Contract Agreement, the Letter of Acceptance, the
Letter of Tender, these Conditions, the Specification, the Drawings, the
Schedules, and the further documents (if any) which are listed in the
Contract Agreement or in the Letter of Acceptance
1.1.1.2" Contract Agreement"means the contract agreement referred to in Sub
Clause 1. 6 Contract Agreement
1.1.1.3Letter of Acceptance"means the letter of formal acceptance, signed by
the Employer, of the Letter of Tender, including any annexed memoranda
comprising agreements between and signed by both Parties. If there is no
such letter of acceptance, the expression"Letter of Acceptance"means the
Contract Agreement and the date of issuing or receiving the Letter of
Acceptance means the date of signing the Contract Agreement
1.1.1.4Letter of tender" means the document entitled letter of tender or letter of
bid, which was completed by the Contractor and includes the signed ofter
to the employer for the Works
1.1.1.5"Specification"means the document entitled specification, as included in
the Contract, and any additions and modifications to the specification in
accordance with the Contract. Such document specifies the Works
1.1.6" Drawings"means the drawings of the Works, as included in the Contract
and any additional and modified drawings issued by (or on behalf of) the
Employer in accordance with the Contract
1.1.1.7" Schedules"means the document(s)entitled schedules, completed by the
Contractor and submitted with the letter of tender as included in the
Contract. Such document may include the bill of quantities, data, lists and
schedules of rates and/or prices
1.1.1.8 "Tender means the Letter of Tender and all other documents which the
Contractor submitted with the letter of tender as included in the contract
TED DO41.9“ Bill of quantities”,“ Daywork Schedule"and"“ Schedule of Payment
Currencies "mean the documents so named (if any) which are comprised
the schedules
DIC 201v/1.10"Contract Data"means the pages completed by the Employer entitled
contract data which constitute Part a of the Particular Conditions
DIC 2010. Conditions of Contract for Construction MDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
1.1.2
1.1.2. 1 "Party"means the Employer or the Contractor, as the context requires
Parties and persons
1.2.2 " Employer means the person named as employer in the Contract data
and the legal successors in title to this person
1.1.2.3 Contractor"means the person(s) named as contractor in the Letter ot
Tender accepted by the Employer and the legal successors in title to this
perso
1.2.4"Engineer"means the person appointed by the employer to act as the
Engineer for the purposes of the Contract and named in the Contract Data,
or other person appointed from time to time by the employer and notified to
the Contractor under Sub-Clause 3. 4 [ Replacement of the Engineer]
1.1.2.5 Contractor's Representative "means the person named by the contractor
in the Contract or appointed from time to time by the Contractor under Su
Clause 4.3 Contractors Representative], who acts on behalf of the
Contractor
1.1.2.6Employer's Personnel means the Engineer, the assistants referred to in
Sub-Clause 3.2 [Delegation by the Engineer] and all other staff, labour and
other employees of the Engineer and of the Employer; and any other
personnel notified to the Contractor, by the Employer or the Engineer, as
Employer's Personnel
1.2."Contractor's Personnel" means the Contractor s representative and all
personnel whom the Contractor utilises on Site, who may include the stat,
labour and other employees of the Contractor and of each Subcontractor; and
any other personnel assisting the Contractor in the execution of the Works
1.1.2.8"Subcontractor"means any person named in the Contract as a
subcontractor, or any person appointed as a subcontractor, for a part of the
Works; and the legal successors in title to each of these persons
1.1.2.9 DB"means the person or three persons appointed under Sub-Clause 20.2
[Appointment of the Dispute Board] or Sub-Clause 20. 3 [Failure to Agree
on the Composition of the Dispute Board]
1.2.10"FIDIC"means the Federation Internationale des Ingenieurs-Conseils, the
international federation of consulting engineers
1.1.2.11"Bank"means the financing institution (if any) named in the Contract Data
1.1.2. 12"Borrower"means the person (f any) named as the borrower in the
Contract Data
1.1.3
Dates, Tests, Periods 1.1.3.1 Base Date"means the date 28 days prior to the latest date for submission
and Completion
of the Tender
TED 1.1.3.2"Commencement Date"means the date notified under Sub-Clause 8.1
[Commencement of Works
aFIDIt.13. 3"Time for Completion"means the time for completing the Works or a Section
(as the case may be)under Sub-Clause 8.2 [Time for Completion], as stated
AFIDIC 20
in the Contract Data (with any extension under Sub-Clause 8. 4 EXtension of
Time for Completion ]), calculated from the Commencement Date
2
DIC 2010. Conditions of Contract for Construction MDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
1.1.3.4 Tests on Completion"means the tests which are specitied in the Contract
or agreed by both Parties or instructed as a variation, and which are carried
out under Clause 9 [Tests on Completion] before the Works or a Section (as
the case may be) are taken over by the employer
1.1.3.5"Taking-Over Certificate"means a certiticate issued under Clause 10
[Employer's Taking Over
1.1.3.6"Tests after Completion"means the tests(if any) which are specified in the
Contract and which are carried out in accordance with the specification after
the Works or a Section (as the case may be) are taken over by the employer.
1.1.3.7"Defects Notification Period"means the period for notifying defects in the
Works or a Section as the case may be) under Sub-Clause 11.1
[Completion of Outstanding Work and Remedying Defects], which extends
over 365 days except if otherwise stated in the Contract Data (with any
extension under Sub-Clause 11.3 [Extension of Defects Notification
Period], calculated from the date on which the Works or Section is
completed as certified under Sub-Clause 10.1 [Taking Over of the Works
1.1.3.8"Performance Certificate"means the certificate issued under sub-Clause
11.9 [Performance Certificate
1.1.3.9 day"means a calendar day and"year "means 365 days
1.1.4
Money and Payments 1.1.4.1 "Accepted Contract Amount "means the amount accepted in the Letter ot
cceptance for the execution and completion of the Works and the
remedying of any defects
1.1.4.2" Contract Price"means the price defined in Sub-Clause 14.1 The
Contract Price, and includes adjustments in accordance with the Contract
1.1.4.3 Cost"means all expenditure reasonably incurred (or to be incurred) by the
Contractor, whether on or off the Site, including overhead and similar
charges, but does not include profit
1.1.4.4 " Final Payment Certificate"means the payment certificate issued under
Sub-Clause 14.13[Issue of Final Payment Certificate
1.1.4.5"Final Statement "means the statement defined in Sub-Clause 14.1
LApplication for Final Payment Certiticate
1.1.4.6"Foreign Currency"means a currency in which part (or all) of the Contract
Price is payable, but not the Local Currency.
1.1.4.7 Interim Payment Certificate" means a payment certificate issued under
Clause 14 [Contract Price and Payment], other than the Final Payment
Certificate
ATED DO4d148 "Local Currency"means the currency of the Country
aFiDi134 9 Payment Certificate"means a payment certificate issued under Clause 14
[Contract Price and Payment
O FIDIC 2 1.1.4.10"Provisional Sum means a sum (if any) which is specified in the Contract as
DIC 2010. Conditions of Contract for Construction MDB harmonised Ed June 2010-General Conditions
anticipating develcpment bank financed contract use only. No reproduction of th s document is permitted
3
(系统自动生成,下载前可以参看下载内容)
下载文件列表
相关说明
- 本站资源为会员上传分享交流与学习,如有侵犯您的权益,请联系我们删除.
- 本站是交换下载平台,提供交流渠道,下载内容来自于网络,除下载问题外,其它问题请自行百度。
- 本站已设置防盗链,请勿用迅雷、QQ旋风等多线程下载软件下载资源,下载后用WinRAR最新版进行解压.
- 如果您发现内容无法下载,请稍后再次尝试;或者到消费记录里找到下载记录反馈给我们.
- 下载后发现下载的内容跟说明不相乎,请到消费记录里找到下载记录反馈给我们,经确认后退回积分.
- 如下载前有疑问,可以通过点击"提供者"的名字,查看对方的联系方式,联系对方咨询.